Transpres — Extension, Stage 2
Bozhurishte Industrial Zone
Status
Completed
Location
Bozhurishte Industrial Zone
Scope of works
Structural, architectural, plumbing and electrical works
Gross built-up area
3,060 m²
About the project
Within a short timeframe Engineering-Construction Company JSC successfully contributed to the delivery of "Transpres — Extension, Stage 2" in the Bozhurishte Industrial Zone. The facility is an industrial building with a gross built-up area of 3,060 m², designed and built in accordance with the high standards required of contemporary industrial and logistics facilities. The company's involvement covered key construction and engineering disciplines — structural, architectural, plumbing, electrical installations and others.
Works executed
- Structural works
- Architectural works
- Plumbing installations
- Electrical installations
Details
- Location
- Bozhurishte Industrial Zone
- Period
- 05.2024
- Gross built-up area
- 3,060 m²
- Scope of works
- Structural, architectural, plumbing and electrical works
- Status
- Completed
Have a similar project?