Extension to a Distribution and Forwarding Centre
Haskovo
Status
Under construction — nearing completion
Location
Haskovo
Scope of works
Main contractor
Gross built-up area
700 m²
About the project
On this project Engineering-Construction Company JSC acts as main contractor, responsible for the overall organisation and execution of the construction and installation works. The scope covers the architectural design, the structural design, a precast reinforced-concrete structure, electrical installations and other associated works. The extension has a gross built-up area of 700 m².
Works executed
- Architectural works
- Structural works
- Precast reinforced-concrete structure
- Electrical installations
Gallery
Details
- Location
- Haskovo
- Period
- 05.2026
- Gross built-up area
- 700 m²
- Scope of works
- Main contractor
- Status
- Under construction — nearing completion