Multi-storey Car Park at Eurohospital University Hospital
Plovdiv
Status
Contractual works completed
Location
Plovdiv
Scope of works
Structural works
Gross built-up area
5,469.60 m²
About the project
Engineering-Construction Company JSC took part in the delivery of a multi-storey car park serving the existing Eurohospital University Hospital. The facility is designed with one underground level and six above-ground levels, with a total gross built-up area of 5,469.60 m². Within the project the company carried out the structural works, comprising the main load-bearing elements of the building.
Gallery
Details
- Location
- Plovdiv
- Period
- 12.2025
- Gross built-up area
- 5,469.60 m²
- Scope of works
- Structural works
- Status
- Contractual works completed
Have a similar project?